Hall steel constructions - 2025

Lot:
A1-28330-2
Sadlno, PL

Collection by appointment

Current bid
Status
Activate Auto-bid
Recommended

About this lot

The structure is made of IPE 330 wall girders and IPE 330 and 270 roof girders.
IPE330 columns 18 pcs.
IPE330 roof girders 18 pcs.
IPE270 front columns 4 pcs.
Vitrified braces.
Steel grade S355.
A set of screws for assembly of the hall.
Hot-dip galvanized structure.
Technical design in 4 copies calculated in accordance with Eurocodes.
Construction in accordance with the PN-EN 1090 standard
Lot number:
A1-28330-2
Location:
Sadlno, PL
Sold by:
Company seller

Lot specifications

Attention please!
Note: Final invoice will be issued directly by Seller. Note: For Buyers outside Poland: After receiving the machine, the Buyer is obliged to send the CMR document confirming export to Troostwijk. If it is not sent within 14 days after receipt, the Buyer's customer will be blocked.

you might like these

Recommended lots

Download the Troostwijk Auctions app now!

App storeGoogle play